你也能在走路、吃饭或进行其他物理活动时尝试这项连结。
You can also try this connection while you are walking, eating, or doing physical work.
如果选取风险以进行机率的减少或是冲击的降低,请规划这项活动,将它分解成工作的工作项目并且每个都连结到风险工作项目。
If a risk is selected for reduction of probability or mitigation of its impact, plan this activity by breaking it into task work items and link each to a risk work item.
这个过程可连结至以活动为主的分类,并被自动化为系统设计的一部份。
The process can be linked to activity-based classification and automated as part of system design.
应用推荐