随着注气速度的增加,油藏的注入能力和储气能力将进一步加强。
As the increasing of gas injection rate, both the injection and storage capacity of the reservoir will improve further.
随着储气运行周期的增加,注入的干气使地层流体逐渐轻化,单井产气能力将逐渐提高;
With the period of gas storage working, the injected dry gas would lighten theformation fluid step by step, as a result, the production capacity of single well would increasing gradually.
应用推荐