在经营过程中,存在许多决策节点,给出了扩展的AON图,结构化描述带有决策节点的经营过程。
The extended AON (Activity on Node) graph is utilized to structurize the business process with decision nodes.
建立了折衷考虑资源、时间和成本约束,以及决策节点的多项目环境下的经营过程配置优化解析模型。
The analytic model of business process assignment optimization is presented to undertake the trade-off among resource, time, cost constraints and decision nodes in multi-project environment.
状态连接器(Condition Connector)重命名为决策节点(Decision Node)。
And then we'll construct our tree as follows: each node, well, let me put an example here.
然后我们如下建立我们的决策树:,每一个节点,好的,让我们在这里举一个例子。
应用推荐