水电站的进水口分为有压进水口和无压进水口。
分析了水电站进水口工作闸门埋件安装过程中遇到的问题及解决方法。
The problem come forth in the installation process of imbed parts of slab gate at the inlet of hydropower station and its treatment were analyzed.
水电站进水口漂浮式拦污排由若干浮箱链接成索状,可简化为柔系平面结构。
The drift barrier installed at the intake of hydropower station for preventing the trash is a flexible system formed by linking floating tanks.
以拉西瓦水电站进水口快速闸门模型试验为例,简要阐述了步进电机的工作原理。
It briefly describes the working principle of stepping motor based upon the gate tests at the intake tunnel for Laxiwa hydropower project.
应用推荐