提出一种应用搜索法、动态规划法实现梯级水电站日经济运行的数学模型和算法。
This paper presents a new mathematical model and algorithm based on dynamic programming and searching method for solving daily economic operation problem on the cascaded hydroelectric power stations.
建立了梯级水电站约束条件的数学模型,包括梯级间的约束条件和水电站自身的约束条件。
It set up the mathematics models of the restriction conditions of the cascaded hydroelectric stations including the cascaded and themselves' restriction conditions.
本文阐述了水电站群径流补偿调节线性规划模型的思路、数学模型、算法和结构,并讨论了模型的目标函数问题。
This paper introduces the theory, the mathematical model, the algorithm, and the structure of a linear programing problem for runoff compensating regulation of a group of hydropower stations.
应用推荐