目前,大朝山水电站建设正在优质高效地进行。
At present, the Dachaoshan Hydropower Station is under construction in high quality and effectiveness.
岩质高边坡的稳定性直接影响到水电站建设的顺利进行。
The stability of high rock slope has a direct impact on the smooth construction of a hydropower station.
古代村落的遗迹因水电站建设而被淹没,而当湖水位下降时又重新露出水面。
The ruins of an ancient village submerged by the construction of a hydroelectric dam resurface when lake levels are low.
应用推荐