go top

有道翻译

水电站大坝施工

Construction of hydropower station DAMS

以上为机器翻译结果,长、整句建议使用 人工翻译

双语例句

  • 扎渡水电站大坝地段的河谷系数施工条件,上道路布置困难

    The dam for the Nuozhadu Hydropower Station is located in an area with small valley coefficient, poor construction conditions and difficult arrangement of access roads to dam crest.

    youdao

  • 介绍岩滩水电站大坝垂线观测系统倒垂线钻孔的孔控制、孔斜测量、孔斜纠偏施工技术及廊道内遇长岩芯的处理方法。

    This paper introduced construction technique of the inverted vertical line survey system, boring, hole slope measuring, slope correcting, etc. of the Yantan hydropower station.

    youdao

  • 由于深溪沟水电站导流洞进口地形狭窄导流洞进口施工围堰大坝基坑布置设计带来极大困难

    The narrow terrain at diversion tunnel inlet bring difficulty for layout design of construction cofferdam and dam pit of Shenxigou hydropower station.

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定