虎跳峡水电站大坝工程属一级大型土石坝。
The major dam of Hutiao Gorge Water-Power Station is first chop large scale earth and rockfill dam.
吉林台一级水电站地处祖国西北边陲,大坝工程是按抗9度地震和满足严寒气候条件设计的。
The dam of Jilintai Hydropower Station I is designed with the specifications for the earthquake intensity of 9 and the severe cold climate.
我国水电站大坝维修加固已取得明显的工程效果和巨大的社会效益,并积累了丰富的经验。
The rehabilitation of dams have gained the remarkable engineering results and the significant social benefit, as well as the rich experience.
应用推荐