东方电机厂在1985年试制成功300MW汽轮发电机,这是国内首台水-氢-氢型300MW汽轮发电机。
The 300MW turbo generator was built in DFEM in 1985. It is the first 300MW turbo generator with water coolest stator winding and hydrogen cooled rotor in China.
本文采用热网络法计算了水-氢-氢汽轮发电机稳态运行冷却水路堵塞时的定子温度场。
This paper USES the equivalent thermal network method to calculate the stator temperature field of the water-hydrogen-hydrogen-cooled turbo-generators when the water cooling system.
应用推荐