本系统采用切换母管制向锅炉供水。
This system supplies water to boilers by alternating header pipes.
论述了母管制热电机组锅炉、汽机的负荷分配运算和协调控制原理。
The operation of load distribution of boiler and turbine as well as the principle for coordinated control for thermal power generation unit with header are expounded.
采用基于专家PID控制方法,给出了母管制运行锅炉蒸汽压力系统新的控制策略。
A new control strategy for steam pressure control of pipe-main operating boiler based on expert PID control strategy is presented.
应用推荐