如果像其它七个部分一样冷却,那么将会出现更多的问题,机器正常运行日期将继续推迟。
If, as the other seven sections are cooled, further problems emerge, the start date will have to be put back still further.
受损程度如此严重,就算在电力恢复的情况下,冷却系统能否正常工作仍旧是个未知数。
Given the scale of the damage, it is not certain the cooling systems will work even if power is restored.
但最新的消息让Black注意到,Tepco首先报告了2号反应堆的冷却水面“虽然‘低于正常水平’,但仍然保持稳定状态”。
Reactor 2 Is (Maybe) Stable With an update, Black notes that Tepco first reported that water levels were "'lower than normal,' but stable" at Reactor 2.