该工程采用以喷锚支护为主、上部结合放坡、并用桩锚支护重点坑段的综合方案,经实践证明是成功的。
In this project, shotcrete-bolt and slope are used in most segments of the pit. and pile-anchor is used in some important pit segment this scheme is proved to be successful.
本文对坑式静压桩技术和顶升纠偏技术作介绍。
This paper introduces the technique about pit-jacked pile and building correction to replace by rising.
采用钻孔灌注桩作为深地坑的围护结构,在坑内设排水沟、集水井排水。
The concrete piles being poured into deep hole act as the enclosure structure of deep pit. There are draining ditch and water gathering well inside the pit for drainage.
应用推荐