公伯峡水电厂调速器采用微机电液调速器加电液随动装置的系统结构,电气柜和机械柜分开设置。
The regulator of Gongboxia hydropower station adopts microcomputer-based electrohydraulic regulator adding servo devices system structure, dividually setting electrical cabinet and mechanical cabinet.
必须完成井道和机房的机械工作以及在井道、控制柜和E&I板的电气安装以确保检修运行。
The mechanical works of hoistway and cabine as well as the electrical installation in the hoistway, controller and E&I Panel have to be finished to ensure inspection run.
井道的机械工作,轿厢,电气零部件的安装,控制柜等必须在第一次正常运行前完成。 电气线路亦须完成及检查。
The mechanical works of hoistway and cabine as well as the electrical installation in the hoistway and controller have to be finished to guarantee runs in normal mode.
应用推荐