而隧道拱顶的下沉过程及其最终下沉量则是隧道支护设计及地层环境控制的重要基础。
Therefore, the vault crown subsiding process and its total settlement are important factors for tunnel supporting design and environment controlling.
但如果考虑本研究,地下水将成为最终的决定性因素,会下沉变为低洼的地势。
Considering this study, groundwater will become the ultimate decisive factor, will sink into the low-lying terrain.
最终它们在东太平洋遇到较冷的温度时下沉。
They eventually subside over the cooler waters of the Eastern Pacific.
应用推荐