在两个构建之间定义一个最大时间间隔。
最大时间范围的频率(例如,晚饭后和周末期间)。
Frequency of the range of maximum times (for example, after dinnertime and during the weekend).
最大等待时间:连接池等待连接返回的最大时间。
Max wait time: the maximum time the pool will wait for a connection to be returned.
I, honestly, time management has probably been my biggest obstacle as being a student.
实话说,也许管理时间是我做为一个学生最大的障碍。
应用推荐