我们书写需求,以便它们总是能够描述在任何时间上被需要的事情,正如“包含一切”的方法中的一样。
We write our requirements so that they always describe what is required over all points in time, as in the "all inclusive" method.
其实,在这两个过程中,你都做了同样的事情:描述任务、评估工作量、在时间表上跟踪项目进度。
You're really doing the same thing in both cases: documenting tasks, gathering work estimates, and tracking progress with an eye on the schedule.
为了完成这个记录,我们应该提到一件战后的事情:在1953年9月,迄今还没有描述的葡聚糖注射的一个严重后果被报道了,即流血时间的延长。
To complete the record, one postwar matter should be mentioned: in September 1953, a hitherto undescribed consequence of dextran injections was reported, a prolongation of the bleeding time.
应用推荐