他已被迫调整了日程安排。
一方面,人们告诉他们要敏捷、灵活、学会自我调整,另一方面,人们又告诉他们要遵从原有的传统铁三角框架,即范围、成本和日程。
On one hand they are told to be agile, flexible, and adaptable, but on the other they are told to conform to pre-planned traditional Iron Triangle framework of scope, schedule, and cost.
日程也许还是固定的约束,但是范围就得调整,以在日程约束之内交付最高的价值。
Schedule might still be a fixed constraint, but then scope could be adjusted to deliver the highest value within the schedule constraint.