·2,447,543篇论文数据,部分数据来源于NoteExpress
最后,对无中墙连拱隧道的施工方案进行了比选,即对交叉中隔壁工法的两种施工工序进行比较分析。
Finally, the construction plans of the double-arch tunnel without middle-wall are compared, that is, two construction process engineering methods of CRD construction method are compared.
youdao
应用推荐
模块上移
模块下移
不移动