go top

网络释义专业释义

  unmanned hydropower plant

定义 中文名称:无人值班水电厂 英文名称:unmanned hydropower plant 定义:平时无现场运行值班人员,一切操作都在远方控制中心进行遥控的水电厂。 应用学科: 电力(一级学科);水工建筑(二级学科) 以上内容由全国科学技术名词审

基于18个网页-相关网页

  • unmanned hydropower plant

·2,447,543篇论文数据,部分数据来源于NoteExpress

双语例句

  • 分析无人值班水电厂基本特征,着重讨论与其设计管理有关的免维护可视性可控可调、冗余配置、设备安全问题。

    After analyzing the basic features, the special requirements associated with design and management of unmanned plant, such as maintenance free, visibility, controllability, and security are discussed.

    youdao

  • 水口水电厂实施无人值班”(少人值守工作,对机电设备进行大量有针对性的改造完善

    The unmanned operation mode is put into practice actively and steadily at the Shuikou Hydropower Plant. Many reforms for perfecting the electric equipment are carried out.

    youdao

  • 具备警戒功能遥视系统实现变电站水电厂无人值班不可或缺技术支撑

    Remote vision system with warning function is an indispensable technical support for the realization of non attended substation.

    youdao

更多双语例句
$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定