机舱内底至花钢板区域,分段阶段油漆施工结束。
For the tank top till loose floor of E/R, all coats should be finished on block stage.
施工结束时,务必立即用水将工具和设备清洗干净。
Tools and equipment are washed with water immediately after use.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
应用推荐