原本通过综合系统与施工状况能得以控制的结构有效地结合可以取得的主要储备并没有实现。
Major savings that could be achieved by integrating technological systems efficiently with structure where conditions of construction can be controlled have not been realized.
现代项目管理中的进度是一个综合的指标,它将施工项目任务、工期、成本、资源有机地结合起来,能全面反映项目的施工状况。
'Progress' in modern project management is an integrated indicator combining systematically the engineering task, time limit, cost and resources and showing overall the construction status.
介绍云浮地区公路工程的地质状况,并对主要工程地质问题的解决结合设计、施工实际进行探讨。
This paper introduces the highway engineering geological conditions in Yunfu area and discusses the main geological problems to be resolved in connection with design and construction practice.
应用推荐