施工期蓄水
Water storage during construction period
以上为机器翻译结果,长、整句建议使用 人工翻译 。
分析了二滩水电站在施工期、竣工蓄水后、水库水位消涨对陆生脊椎动物的影响及应采取的对策。
The influences of Ertan Hydroelectric project under construction, post completion and the water levels' rise and fall in the reservoir on terrestrial vertebrate and the measures are analyzed.
youdao
应用推荐
模块上移
模块下移
不移动