建筑所用的沙子从海底运来然后铺洒在施工场地。
Sand is taken from the seabed and sprayed into the construction site.
考虑施工场地的时间进程,采用悬臂桩作为支档结构。
At the same time, cantilever piles are always used as the support structure considering of construction time.
过去的经验很明显的显示出在施工场地的协作经营很重要。
Past experience clearly shows the importance of a single coordinated management effort on site.
应用推荐