...调;施工信息管理系统;监理月报;应用 [gap=702]Key words: South-to-North Water Transfer; construction information system; supervisory monthly report; application ...
基于6个网页-相关网页
然后,在分析施工质量信息管理的内容和特点的基础上,设计了系统的总体结构。
Then, based on analysis of quality information management in construction phase, the system architecture was presented.
研究了快速施工下信息管理的方法,分析了信息管理的系统结构,构架了快速施工信息管理的系统模式。
The method to manage the information is put forward. The structure of information management system is analyzed and information management mode of quick construction is constructed.
应用推荐