因此,解析优化方法在装备的复杂加速试验方案优化设计中难以应用。
Therefore, optimal design problems of complex AT plans for equipment are difficult to be solved by analytical approaches.
在泵站可选位置确定的条件下,采用赋权有向图来表示工艺方案优化设计问题。
Under the given locations of candidate pump station, the graph theory was used to analyze the problem.
最后选取了一家MB A院校,根据其实际情况,进行了简单的营销方案优化设计。
In the end, this paper designs a simple promotion mode according to some particular situation of a MBA school.
应用推荐