介绍沈阳公和斜拉桥主塔承台冬季施工的要点和实施中的主要技术措施。
This paper presents the construction highlights and principal technical measures adopted in the construction of pylon pier bases of Gonghe Cable Stayed Bridge in Shenyang in winter season.
对大型斜拉桥主塔基础钢围堰的制作、拼装、定位及下沉的施工测量作了全面论述。
This paper deals with the construction surveying of manufacture, installation, positioning and settlement of steel cofferdam of main towers foundation for a large cable bridge.
滨州黄河大桥主桥是三塔预应力混凝土斜拉桥,主梁为预应力混凝土箱梁。
Binzhou Yellow River bridge is a three-tower cable-stayed bridge with prestressed concrete girders.
应用推荐