地下连续墙接头采用预制钢筋砼接头桩连接止水,两端头井辅以深层搅拌桩加固地基。
The tie in segment of the diaphragm wall is connected using pre reinforced concrete pile. The foundation strata of two shield well is also reinforced by deep mixing piles in order to seal water.
介绍了温州瓯海大道桥头路堤采用低强度砼桩和水泥搅拌桩组合复合地基处理桥头跳车问题。
This paper introduces a successful application of the composite foundation with low-strength-concrete pile and cement-mixed pile in Ouhai road of Wenzhou to alleviate bridge-head jump.
通过在路堤下埋设钢弦式压力盒,获得了路堤下低强度砼桩、水泥搅拌桩以及土的应力比数值随时间的变化规律,并分析了三者荷载分担比随时间的变化特性。
Through pressure metre under embankment, the magnitude of pile-soil stress ratio and its variation with the time are measured, and the variation of pile-soil load share ratio with time is analyzed.