拒绝,要求重新设计。如果客户提出的替代方案可以被接受,而需要对经认可的设计资料进行修订时,将与该供应商联系,要求其接受附带成本费用。
Reject subject to redesign. When a deviation may be accepted but would require revision to approved design data, the vendor will be contacted requesting that associated costs are accepted.
分析比较几种检测标准取值的依据,提出检测结果取值的方案,为国家测试标准GB/T 15789-1995《土工布透水性测定方法》的修订提供依据。
The scheme of drawing figures from test results was pointed out by analyzing on basis of drawing figures, for providing the basis on revising for national test standard GB/T 15789-1995 .
应用推荐