钢板桩施工组织设计编制合理,技术控制到位是保证钢板桩防渗墙顺利施工的必要前提。
The reasonable construction design and conscientious technical control is the essential prerequisite for the smooth construction of steel sheet pile seepage prevention wall.
它表明预防控制措施没有到位,或者没有发挥好作用。
It means preventive controls were either not in place or not used effectively.
在他们从事遵从法规的项目时,他们也必须建立一个严格的测试计划以确保所有的需求都实现,正确的过程控制都最终到位。
And as they embark on compliance projects, they must also establish a rigorous test plan that ensures all requirements are being met, and that the right process controls are ultimately put in place.
应用推荐