水发着响亮的汩汩声流下了排水洞。
根据张峰水库左岸塌滑体的工程地质条件等,给出了塌滑体排水洞的具体设计方案。
Based on the engineering geological conditions of the slip-mass on the left bank of Zhangfeng Reservoir, this paper puts forward the concrete design plan for the slip-mass scupper.
基于工程滑坡实例研究,利用数值模拟,揭示了滑坡治理工程中地下排水洞的排水效果,分析了地表水集中入渗和设置抗滑桩后地下水渗流场的变化特征。
A numerical simulation case study is used to demonstrate the drainage effects on underground tunnel, the groundwater table changes caused by surface water infiltration and anti-sliding piles Settings.
应用推荐