采用拔杆分组机构,效率高。
通过对斜顶杆工作过程的逆向思考,采用拔杆为后模滑块提供动力。
Through reverse thinking of working principle of inclined push rod, this mold adopts button pole to offer power to rear mold slide block.
针对该网架的工程特点及现场的具体情况,决定采用绞磨拔杆整体吊装方法。
According to engineering characters and concrete situation the winching and rocker integral hoisting method is adopted.
应用推荐