升降机导轨架的安装与拆卸必须在风力小于4级的天气情况下进行。
The installment and dismantle of guiding track framework be done under the wind force below grade 4.
拆卸:把已经组装好的轴承拆开;保持架被切掉或拆卸展开然后丢弃,而滚子和内圈从其取出并重新进行加工。
KNOCK DOWN: To disassemble a previously assembled bearing; the cage is cut or spread and discarded and the rollers and cones are salvaged and reprocessed.
设计中,脚手架结构内部的设备排成一排,便于拆卸。
The facilities are arranged in a line within a scaffolding structure, which is designed to be easily disassembled.
应用推荐