不合格项评审不包括检验员确定的报废产品,也不包括检验员确定的返工项目。
The review of nonconforming items does not include the rejected products and reworked items determined by inspectors.
在新项目移交到生产部门前,按照GQS的要求,基于实际报废率计划及更新PFMEA;
Plan and update PFMEA based on real scrap rate before new project hand over to production department as GQS required.
全寿命周期控制,就是对工程项目规划决策、设计、施工、生产运营直到报废的各个阶段进行全盘考虑,进行综合造价控制。
Life cycle cost control, that is, decisions on project planning, design, construction, manufacturing operations in all stages comprehensive cost control.