... building-out network 附加[平衡]网络,补偿网络 building reconstruction 房屋重建 building regulation 建筑规程 ...
基于94个网页-相关网页
·2,447,543篇论文数据,部分数据来源于NoteExpress
房屋重建比原计划提前了三个月。
That puts housing reconstruction three months ahead of schedule.
这比预计的房屋重建时间提早了3个月。
That was hosing reconstruction three month ahead of schedule.
对施工现场及基础设施的规划并未应用于房屋重建中。
The planning of site engineering design and infrastructure did not run parallel with the reconstruction of houses.
So, you could buy apartment buildings for way less than it would cost to replace them.
所以,你可以买公寓,这比你自己花钱重建房屋,要省钱。
应用推荐