泸州长江二桥为大跨度非对称连续刚构,采用悬臂浇筑施工。
Pipeline hindering test of continual box beam prestressed in cantilever pouring construction;
这次能这么近距离看耒水大桥合龙,要归功于大桥的施工技术——挂篮施工、悬臂浇筑施工。
The plow can see the water so close to the bridge closure, thanks to the bridge construction technology - hanging basket construction, cantilever casting construction.
文章介绍了该桥在悬臂浇筑施工过程中监控的目标、方法、数据分析、调控措施和监控效果。
The article describes the monitor objective, method, data analysis, regulating control measures and monitoring result in the course of cantilever concreting construction of the bridge.
应用推荐