... 节段梁; 短线法; 悬臂拼装; 几何控制; 预拱度 [gap=531]Keywords: precise festival; Short line method; Cantilever assembly; Geometry control; The arch degrees ...
基于24个网页-相关网页
Results show that if the local deformation of individual segment is neglected in the determination of fabrication dimensions,errors in pre-assembled geometry will increase with the cantilever erection construction process,the quality and shrinkage of welding seam will be hard to control.
研究结果表明:若忽略梁段局部变形,则预拼线形的误差会随着悬臂拼装的进行不断放大,梁段顶、底板处的焊缝质量和焊接收缩变形将难以控制。
参考来源 - 桥梁悬臂拼装施工中钢箱梁制造尺寸的确定At present, the main construction methods of long span RC arch bridge in China are arch centering method, cable-hoisting erection method, precast segmental cantilever method, swing method and Melan method.
目前,我国大跨度钢筋混凝土拱桥采用的施工方法主要有体外支架法、缆索吊装法、悬臂拼装法、转体法和劲性骨架法。
参考来源 - 悬臂浇筑钢筋混凝土拱桥模型试验研究·2,447,543篇论文数据,部分数据来源于NoteExpress
本文叙述了悬臂拼装预应力混凝土连续梁的预加力引起的弯矩重分布。
In this paper the moment redistribution due to prestressing in precast segment continuous prestressed concrete beam erected by cantilever method is described.
因其构造上分块构件较多的特点,组合梁在悬臂拼装施工时的监控显得尤为重要。
Because of its structural characteristics of more block elements, the construction control of composite beams is particularly important when cantilevered assembling.
应用推荐