总干渠,大型灌溉系统中位于干渠地位以上的大型干渠。
...总干渠;坡水区;防洪水位;二维;非恒定流;数学模型 [gap=959]Key words: Mid-Route South-to-North Water Transfer Project;general main channel;sloping field;flood protection level;two-dimensional;unsteady flow;mathematical..
基于16个网页-相关网页
There is a strict request on the water head allocation of aqueduct in main channel of Middle Route of North-South Water Transfer Project.
南水北调中线总干渠上渡槽等建筑物上的分配水头有严格要求。
参考来源 - 南水北调中线工程槐河(二)渡槽水力特性试验研究—《南水北调与水利科技》—2008年第1期—龙源期刊网·2,447,543篇论文数据,部分数据来源于NoteExpress
盘道岭隧洞是引大入秦灌溉工程总干渠上最长的无压引水隧洞。
The Pandaoling tunnel is the longest non-pressure diversion tunnel of the main channel from Datong river to water irrigation project at Qinwangchuan region.
盘道岭隧洞是甘肃引大入秦灌溉工程总干渠上最长的无压引水隧洞。
The Pandaoling tunnel is the longest non-pressure diversion tunnel of the main channel of theDatong River to Qinwangchuan region water transferring irrigation project.
本文针对淠河总干渠(城区段)边坡这一实际工程引入了安全系数和可靠度相结合的双重指标体系分析方法进行稳定分析,得出了较为全面的结论;
This paper has come to some comprehensive conclusions on the basis of the practical use of this double-index evaluation method in the slope of Pishihang Channel.
应用推荐