分析了工程建设前期造价控制的必要性,提出了在建设前期控制工程造价的有效途径和措施。
The necessities of controlling construction cost in the early stage of a construction project are analyzed.
结合南方地区某一火电厂工程实例,探讨了地面物探技术在火电厂建设前期地质探测中的应用状况。
To combine with an example of the thermal power plate in south China, application of around geophysical prospecting technique is analyzed and discussed in construction prophase.
建设前期工程造价控制的有利途径有很多,其中优选方案、推行价值工程限额设计等都是行之有效的方法。
There are some useful measures to solve these problems, such as value engineering, limited designing, and so on.