研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
为满足CFB锅炉的物料平衡要求,低灰份燃料需要添加一定粒径分布的可循环物料。
For meeting stuff balancing requirements of CFB boilers, circulatable material of a certain size-range has to be added to fuels of low ash content.
用耦合燃耗计算程序COUPLE2.0模拟得到了深燃耗气冷快堆的铀燃料循环的平衡态。
The coupled depletion calculation code COUPLE2.0 was used to get the equilibrium states of 300 MWt pebble bed GFR.
应用推荐