在汽机DEH系统适应快速降负荷的情况后,根据汽机主设备要求的时间短暂带厂用电负荷运行进行滑压停机。
The turbine DEH system adapts to prompt load drop, when the unit runs with transient house load to realize sliding pressure shutdown following the time required by turbine main equipment.
对汽轮发电机在多次起停带负荷运行条件下,转子绕组的应力和变形进行了分析和计算;
And a detail description of computing and analyzing turbo-generator rotor winding stress and distortion in operation after many starts and stops is presented.
本文详细介绍了某300MW机组在起动及带负荷运行过程中产生振动异常的处理情况。
The paper gives a particular analysis on a 300MW turbogenerator that the abatement process of the abnormal vibration on the turbine during the first start-up and running with load.
应用推荐