放系缆给带缆艇,前后缆送上码头,开始绞靠。
Loweredlines to line boat, sent bow and stern lines ashore and started heavingalongside pier.
机械装臵、带缆桩、艇吊和其它重型负载集中区域下方的甲板应采用短纵桁或复板进行加强,具体应经过船级社认可。
Decks under machinery, bollards, boat davit and other heavy concentrated loads to be reinforced by carling or welded doubler where necessary as approved by Class.
应用推荐