工程交付使用一段时间后,由于冻害等原因,渠道衬砌产生不同程度的横向、纵向及不规则裂缝。
Due to cold damage, different cracks, crosswise crack, vertical crack and irregular crack, occurred to varying degree after the project had been used for a while.
依照第25款的规定,买方有权在工程交付使用前要求对工程的工作范围、设计和建造进行更改。
Subject to the provisions of Clause 25, the Purchaser is entitled to require variations to the scope, design and construction of the Works until the Works have been taken over.
表2展示了计划交付使用的条目以及工程中个别用到的软件组件。
Table 2 shows the planned deliverables and the individual software components used in the project.
应用推荐