当码头岸墙高度较大时,板桩的锚拉杆需在两根以上,才能减小板桩墙的水平位移。
Also it is necessary to use two anchor ties to minimize horizontal displacement of sheet-pile wall while wharf bank wall with a large height.
在城西闸闸室稳定设计中,利用公路桥桥面适当填土来调整闸室的重心位置,并增做刺墙以减小空箱岸墙的墙后受荷宽度。
Such methods include that filling earth in the traffic bridge to change the position of gravitative centre of sluice chamber, and adding insertwalls to reduce the wall pressure of boxshaped wall.
两旁是水晶的墙,前面是耶和华的荣光。 终夜都是这样;到了天一亮,最后一个以色列人也上了岸,大东风的使命便完成了。
So on through all that night; and when, at dawn of the next day, the last of Israel's host set foot upon the other shore, the work of the stormy wind was done.
应用推荐