得到如此多的帮助, 她很高兴。(完成被动式)
管道和电缆架没有进行埋线,大部分的通风和制冷设施通过半被动式系统完成。
Pipes and cable trays are not hidden and most of ventilation and cooling is done through semi-passive systems.
于是NOEM用了十周完成这个现代感十足的被动式住宅。
NOEM designed and built this modern passive house for them, and in 10 weeks finished the project.
应用推荐