用电结构的变化要求大容量机组普遍参与电网调峰。
Change of power consumption structure requires most large-capacity units to be involved in peak load regulation of electricity grid.
随着大容量机组的不断投运,其安全运行的要求也越来越高。
With the increase of more large capacity generators, higher requirement is needed.
近年来,大容量锅炉高温受热面超温爆管现象普遍,严重危及了机组的安全、经济运行。
The prevalent over-temperature caused tube bursting of high-temperature heating surface in large-capacity boilers in recent years has seriously endangered the safe and economic operation of units.
应用推荐