工程实践表明,采用此类管桩施工不仅能保证质量,而且能大大缩短施工周期。
The engineering practice indicates that use of the pipe pile can not only guarantee the quality, but also shorten greatly the construction period.
可节约工时50%——70%,大大加快施工进度,缩短施工周期。
Saving hours of 50% — 70%, greatly accelerate the construction progress, shorten the construction period.
应用推荐