高层住宅采用将钢丝网架聚苯板放置于外墙外模板内侧,在墙体混凝土浇注时一次成型的外保温体系。
Steel mesh polystyrene boards are placed in the inner side of the exterior formworks and the external insulation system is formed at one stroke during wall concreting of the high rise buildings.
XSLT中的第二个模板规则会命令处理器复制所有元素并继续执行子元素,因此,除了电子邮件地址外,其他内容没有发生改变。
The second template rule in the XSLT is instructing the processor to copy all elements and continue to their children, so that nothing else is changed other than the email addresses.
除了复制映像模板外,还需要将映像的元数据导入DCM。
In addition to copying the image template, the metadata for the image needs to be imported into the DCM.
应用推荐