针对中国电影博物馆工程使用长螺旋钻管内泵压CF G桩复合地基施工技术作了一些有益的尝试、研究和总结。
The construction technique of CFG piled composite foundation by long auger boring methodology is studied and summarized according to the project of China Film Museum.
有效桩长是柔性桩复合地基设计时需要考虑的一个重大问题。
Effective pile length is an important problem that should be thought about when making a design of flexible piles composite foundation.
水泥搅拌桩桩长是复合地基设计中的一个主要参数。
Pile length is a key parameter in cement mixing pile composite foundation design.
应用推荐