沿海堤坝工程的合龙,不同于江河截流。
The closure works for offshore dykes are different from the closure works for a river.
堤坝工程质量隐患的类型、位置及严重程度都是极其复杂的。
The dike project quality hidden danger type, the position and the serious degree all are extremely complex.
同时,美国陆军工程师们并没有拿出增高堤坝和海岸线的合理方案,该计划曾被国会称为“第五类”的保护措施。
The Corps of Engineers, meanwhile, has failed to produce plans for higher levees and coastal restoration that would provide so-called “Category 5” protection, as Congress has demanded.
应用推荐