完成了基础埋石、首级四等测量、一级平面导线测量、等外水准测量、图根控制等野外数据采集以及数据编辑工作。
The completion of the foundation buried stone heads, four measurements, a flat wire measurement, substandard level of measurement, map the root control field data collection and data editing.
工人们挖好坑,埋进木桩,每根木桩都标着号码,以便插在规定的地点。
The workmen dug holes and fitted in the timbers, each timber numbered for its regular place.
第三项安全配备是一根又长又细的竿子,用来探测雪中深处以找出被埋滑雪者的精确位置。
The third piece of safety equipment is a long, think pole. It's used to probe deep into the snow to pinpoint the location of a buried skier.
应用推荐